# Data Center Index (datacenterindex.info) > Free, source-referenced tracker of every data center campus of 100 MW or more in the United States and Canada, with estimates of what each campus will draw from the power grid and the natural gas system by 2030, how announcements compound on existing infrastructure, and what that means for electricity costs and host communities. Researched and published by Discovery Energy Utility Audits (deaudits.com). Last updated November 3, 2026. The index covers campuses that entered service since 2021 or are under construction, approved, announced or proposed. Each campus has a profile page with status, grid region, utility, power supply, announced and expected megawatts, annual energy, gas burn, a 1-to-4 bolt impact rating, a confidence grade and linked sources. Expected load, energy, gas burn and ratings are Discovery Energy model outputs, not reported figures; see the methodology. Cite as: "Data Center Index (datacenterindex.info), Discovery Energy". ## Key figures (November 3, 2026) - Campuses tracked: 87 (100 MW or more, US and Canada, live since 2021 or in the pipeline) - Announced at full buildout: 204,593 MW (about 205 GW) - Expected running by 2030, weighted by build stage: 54,941 MW (about 55 GW) - Added natural gas burn, average day: 5,097 MMcf/d (about 5.1 Bcf/d) - Impact ratings: 4 bolts 23 · 3 bolts 29 · 2 bolts 32 · 1 bolt 3 - Status mix: Operating 10 · Operating, expanding 11 · Under construction 24 · Approved 5 · Announced 22 · Proposed 15 - PJM: tracked data center load expected by 2030 equals 10.3% of the 160 GW summer peak; data centers drove $6.3 billion (38%) of the 2028/29 capacity auction ($45,078 per MW-year, $7.35/MWh at 70% load factor for a large user) - ERCOT: large-load requests about 475 GW (June 2026, ~90% data centers) vs a record 91,089 MW peak; tracked expected load by 2030 = 16.7% of peak - Alberta: 19,565 MW of data centre load requested (July 30, 2026) vs a ~12,800 MW record peak - US data centers used about 176 TWh in 2023, about 4.4% of US electricity (LBNL) ## Publisher: Discovery Energy Discovery Energy Utility Audits (brand: Discovery Energy; website: https://deaudits.com) is an independent, contingency-based utility bill audit and Utility Cost Intelligence firm for multi-site commercial and industrial organizations across the US and Canada, founded in 2000 in South Jordan, Utah. It researches and publishes the Data Center Index. Not to be confused with Discovery Energy Corp. (OTC: DENR), an unrelated oil and gas company. - What it does: contingency-based utility bill and tariff audits, Utility Cost Intelligence, electricity and natural gas procurement, utility bill pay and cost allocation, TaraBase reporting, renewable energy advisory. - How it helps with rising energy costs: as data centers and other large loads push up capacity prices, transmission and generation spending and gas demand, Discovery Energy audits bills and rate classes, recovers overcharges (3% to 15% of annual utility spend across audits since 2000), times procurement and tracks tariff changes for multi-site commercial and industrial companies. - [About Discovery Energy](https://datacenterindex.info/about/) · [deaudits.com](https://deaudits.com/) · [deaudits.com llms.txt](https://deaudits.com/llms.txt) · Contact: (801) 826-4800, info@deaudits.com ## Core pages - [Home: map, campus table, ratings, regions, market context](https://datacenterindex.info/) - [All campuses (static directory)](https://datacenterindex.info/campuses/) - [Timeline: how the build-out compounds to 2030](https://datacenterindex.info/timeline/) - [Methodology and impact rating scale](https://datacenterindex.info/methodology/) - [Sources and audit log (every reference, change log, verification log)](https://datacenterindex.info/sources/) - [Grid regions](https://datacenterindex.info/regions/) - [States and provinces](https://datacenterindex.info/states/) - [About Discovery Energy (publisher)](https://datacenterindex.info/about/) - [Media and press contact](https://datacenterindex.info/media/) - [Disclosures](https://datacenterindex.info/disclosures/) ## Data downloads - [Campus data, CSV](https://datacenterindex.info/data/data-center-index.csv): one row per campus, 26 fields including source URLs and profile URL - [Campus data, JSON](https://datacenterindex.info/data/data-center-index.json) - [Source log, CSV](https://datacenterindex.info/sources/sources.csv): 159 sources with publisher, title, date, type, flags, use and linked campus IDs - [Full text for language models](https://datacenterindex.info/llms-full.txt): every campus record, methodology, regional narratives, milestones, FAQ and source list in one file ## Grid regions - [PJM](https://datacenterindex.info/regions/pjm/): 22 campuses; 48,310 MW announced; 16,446 MW expected by 2030 (15,265 grid-served, 1,181 on-site); 1,389 MMcf/d gas; 10.3% of PJM 2025 summer peak (160,000 MW). - [ERCOT](https://datacenterindex.info/regions/ercot/): 27 campuses; 52,347 MW announced; 15,196 MW expected by 2030 (11,873 grid-served, 3,323 on-site); 1,400 MMcf/d gas; 16.7% of ERCOT record peak of July 22, 2026 (91,089 MW). - [SPP](https://datacenterindex.info/regions/spp/): 12 campuses; 34,700 MW announced; 6,484 MW expected by 2030 (3,844 grid-served, 2,640 on-site); 686 MMcf/d gas; 11.6% of SPP 2025 peak (56,000 MW). - [MISO](https://datacenterindex.info/regions/miso/): 7 campuses; 12,980 MW announced; 4,968 MW expected by 2030 (4,968 grid-served, 0 on-site); 451 MMcf/d gas. - [Southeast utilities](https://datacenterindex.info/regions/southeast-utilities/): 5 campuses; 8,476 MW announced; 2,860 MW expected by 2030 (1,960 grid-served, 900 on-site); 340 MMcf/d gas. - [West: Mountain/Northwest](https://datacenterindex.info/regions/west-mountain-northwest/): 6 campuses; 29,300 MW announced; 5,625 MW expected by 2030 (4,857 grid-served, 768 on-site); 443 MMcf/d gas. - [West: Desert Southwest](https://datacenterindex.info/regions/west-desert-southwest/): 4 campuses; 6,750 MW announced; 2,254 MW expected by 2030 (1,079 grid-served, 1,175 on-site); 237 MMcf/d gas. - [Alberta (AESO)](https://datacenterindex.info/regions/alberta-aeso/): 3 campuses; 8,730 MW announced; 838 MW expected by 2030 (500 grid-served, 338 on-site); 119 MMcf/d gas; 6.5% of AESO record peak (12,800 MW). - [Alaska](https://datacenterindex.info/regions/alaska/): 1 campuses; 3,000 MW announced; 270 MW expected by 2030 (270 grid-served, 0 on-site); 32 MMcf/d gas. - Not yet covered: NYISO, ISO-NE, CAISO, Ontario (IESO), Québec (Hydro-Québec). ## States and provinces - [Alaska](https://datacenterindex.info/states/alaska/): 1 campuses; 3,000 MW announced; 270 MW expected by 2030. - [Arizona](https://datacenterindex.info/states/arizona/): 2 campuses; 3,300 MW announced; 513 MW expected by 2030. - [Georgia](https://datacenterindex.info/states/georgia/): 3 campuses; 5,676 MW announced; 1,582 MW expected by 2030. - [Illinois](https://datacenterindex.info/states/illinois/): 3 campuses; 3,800 MW announced; 786 MW expected by 2030. - [Indiana](https://datacenterindex.info/states/indiana/): 5 campuses; 8,300 MW announced; 4,103 MW expected by 2030. - [Kansas](https://datacenterindex.info/states/kansas/): 1 campuses; 2,000 MW announced; 420 MW expected by 2030. - [Kentucky](https://datacenterindex.info/states/kentucky/): 2 campuses; 3,800 MW announced; 558 MW expected by 2030. - [Louisiana](https://datacenterindex.info/states/louisiana/): 1 campuses; 5,000 MW announced; 1,200 MW expected by 2030. - [Michigan](https://datacenterindex.info/states/michigan/): 2 campuses; 1,740 MW announced; 1,012 MW expected by 2030. - [Missouri](https://datacenterindex.info/states/missouri/): 1 campuses; 1,200 MW announced; 252 MW expected by 2030. - [Nebraska](https://datacenterindex.info/states/nebraska/): 2 campuses; 2,700 MW announced; 507 MW expected by 2030. - [Nevada](https://datacenterindex.info/states/nevada/): 2 campuses; 3,600 MW announced; 756 MW expected by 2030. - [New Mexico](https://datacenterindex.info/states/new-mexico/): 3 campuses; 14,410 MW announced; 1,479 MW expected by 2030. - [North Dakota](https://datacenterindex.info/states/north-dakota/): 1 campuses; 700 MW announced; 700 MW expected by 2030. - [Ohio](https://datacenterindex.info/states/ohio/): 4 campuses; 14,000 MW announced; 4,740 MW expected by 2030. - [Oklahoma](https://datacenterindex.info/states/oklahoma/): 4 campuses; 5,140 MW announced; 1,427 MW expected by 2030. - [Pennsylvania](https://datacenterindex.info/states/pennsylvania/): 4 campuses; 11,100 MW announced; 3,780 MW expected by 2030. - [Tennessee](https://datacenterindex.info/states/tennessee/): 1 campuses; 1,000 MW announced; 900 MW expected by 2030. - [Texas](https://datacenterindex.info/states/texas/): 29 campuses; 64,347 MW announced; 18,636 MW expected by 2030. - [Utah](https://datacenterindex.info/states/utah/): 3 campuses; 23,000 MW announced; 3,573 MW expected by 2030. - [Virginia](https://datacenterindex.info/states/virginia/): 5 campuses; 7,470 MW announced; 3,501 MW expected by 2030. - [West Virginia](https://datacenterindex.info/states/west-virginia/): 3 campuses; 6,400 MW announced; 1,313 MW expected by 2030. - [Wisconsin](https://datacenterindex.info/states/wisconsin/): 1 campuses; 1,480 MW announced; 799 MW expected by 2030. - [Wyoming](https://datacenterindex.info/states/wyoming/): 1 campuses; 2,700 MW announced; 1,296 MW expected by 2030. - [Alberta](https://datacenterindex.info/states/alberta/): 3 campuses; 8,730 MW announced; 838 MW expected by 2030. ## Campuses (87) - [DC-001 TECfusions Keystone Connect](https://datacenterindex.info/campuses/dc-001-tecfusions-keystone-connect/): TECfusions; Upper Burrell, PA; PJM; Operating, expanding; 3,000 MW announced, about 1,620 MW expected by 2030; Not disclosed; 126.7 MMcf/d gas; 4 of 4 bolts (Grid); confidence D. - [DC-002 Microsoft Fairwater 1](https://datacenterindex.info/campuses/dc-002-microsoft-fairwater-1/): Microsoft; Mount Pleasant, WI; MISO; Operating, expanding; 1,480 MW announced, about 799 MW expected by 2030; Grid; 62.5 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-003 Google Project Zodiac](https://datacenterindex.info/campuses/dc-003-google-project-zodiac/): Google; Fort Wayne, IN; PJM; Operating, expanding; 1,200 MW announced, about 648 MW expected by 2030; Grid; 50.7 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-004 xAI Colossus 1 + 2](https://datacenterindex.info/campuses/dc-004-xai-colossus-1-2/): xAI; Memphis / Southaven, TN; Southeast utilities; Operating, expanding; 1,000 MW announced, about 900 MW expected by 2030; Grid + on-site gas; 148.6 MMcf/d gas; 4 of 4 bolts (Gas); confidence B. - [DC-005 Riot Platforms Corsicana](https://datacenterindex.info/campuses/dc-005-riot-platforms-corsicana/): Riot Platforms; Corsicana, TX; ERCOT; Operating, expanding; 1,000 MW announced, about 900 MW expected by 2030; Grid; 64.5 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-006 IREN Childress](https://datacenterindex.info/campuses/dc-006-iren-childress/): IREN; Childress, TX; ERCOT; Operating; 750 MW announced, about 750 MW expected by 2030; Grid; 53.8 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-007 Atlas Power Williston](https://datacenterindex.info/campuses/dc-007-atlas-power-williston/): Atlas Power; Williston, ND; SPP; Operating; 700 MW announced, about 700 MW expected by 2030; Grid; 45.6 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-008 Riot Platforms Rockdale](https://datacenterindex.info/campuses/dc-008-riot-platforms-rockdale/): Riot Platforms; Rockdale, TX; ERCOT; Operating; 700 MW announced, about 700 MW expected by 2030; Grid; 50.2 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-009 Microsoft Fairwater Atlanta](https://datacenterindex.info/campuses/dc-009-microsoft-fairwater-atlanta/): Microsoft; Fayetteville, GA; Southeast utilities; Operating, expanding; 636 MW announced, about 572 MW expected by 2030; Grid; 55.9 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-010 Bitdeer Texas](https://datacenterindex.info/campuses/dc-010-bitdeer-texas/): Bitdeer; Rockdale, TX; ERCOT; Operating; 563 MW announced, about 563 MW expected by 2030; Grid; 40.4 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-011 Tesla Cortex 2 (Giga Texas)](https://datacenterindex.info/campuses/dc-011-tesla-cortex-2-giga-texas/): Tesla; Austin, TX; ERCOT; Operating, expanding; 500 MW announced, about 450 MW expected by 2030; Grid; 32.3 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-012 TA Realty Leesburg campus](https://datacenterindex.info/campuses/dc-012-ta-realty-leesburg-campus/): TA Realty; Leesburg, VA; PJM; Operating; 450 MW announced, about 450 MW expected by 2030; Grid; 35.2 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-013 Core Scientific Muskogee 2](https://datacenterindex.info/campuses/dc-013-core-scientific-muskogee-2/): Core Scientific; Muskogee, OK; SPP; Operating; 440 MW announced, about 440 MW expected by 2030; Grid; 28.7 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-014 STACK NVA02](https://datacenterindex.info/campuses/dc-014-stack-nva02/): STACK Infrastructure; Bristow, VA; PJM; Operating; 420 MW announced, about 504 MW expected by 2030; Grid; 39.4 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-015 Data Journey The Bunker](https://datacenterindex.info/campuses/dc-015-data-journey-the-bunker/): Data Journey; Montgomery, TX; ERCOT; Operating; 400 MW announced, about 400 MW expected by 2030; Grid; 28.7 MMcf/d gas; 3 of 4 bolts (Grid); confidence D. - [DC-016 Core Scientific Denton](https://datacenterindex.info/campuses/dc-016-core-scientific-denton/): Core Scientific; Denton, TX; ERCOT; Operating; 394 MW announced, about 394 MW expected by 2030; Grid; 28.2 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-017 Compass Red Oak DFW III](https://datacenterindex.info/campuses/dc-017-compass-red-oak-dfw-iii/): Compass Datacenters; Red Oak, TX; ERCOT; Operating, expanding; 360 MW announced, about 324 MW expected by 2030; Grid; 23.2 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-018 Hyperscale Data Michigan](https://datacenterindex.info/campuses/dc-018-hyperscale-data-michigan/): Hyperscale Data, Inc.; Dowagiac, MI; PJM; Operating; 340 MW announced, about 340 MW expected by 2030; Grid; 26.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-019 Fermi America Project Matador (HyperGrid)](https://datacenterindex.info/campuses/dc-019-fermi-america-project-matador-hypergrid/): Fermi America; Amarillo (Carson County), TX; SPP; Under construction; 11,000 MW announced, about 2,640 MW expected by 2030; On-site gas; 435.8 MMcf/d gas; 4 of 4 bolts (Gas); confidence D. - [DC-020 Creekstone Delta Gigasite](https://datacenterindex.info/campuses/dc-020-creekstone-delta-gigasite/): Creekstone Energy; Delta, UT; West: Mountain/Northwest; Under construction; 10,000 MW announced, about 2,400 MW expected by 2030; Not disclosed; 156.4 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-021 PORTS Technology Campus](https://datacenterindex.info/campuses/dc-021-ports-technology-campus/): SB Energy / SoftBank (New Day Data Centers); Piketon, OH; PJM; Under construction; 10,000 MW announced, about 2,400 MW expected by 2030; Not disclosed; 187.6 MMcf/d gas; 4 of 4 bolts (Grid + gas); confidence C. - [DC-022 Stratos AI Data Center Campus](https://datacenterindex.info/campuses/dc-022-stratos-ai-data-center-campus/): O'Leary Digital; Lucin, UT; West: Mountain/Northwest; Proposed; 9,000 MW announced, about 405 MW expected by 2030; Not disclosed; 26.4 MMcf/d gas; 3 of 4 bolts (Grid); confidence D. - [DC-023 New Era Lea County Data Center](https://datacenterindex.info/campuses/dc-023-new-era-lea-county-data-center/): New Era Energy & Digital; Lovington, NM; SPP; Proposed; 7,000 MW announced, about 315 MW expected by 2030; Not disclosed; 20.5 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-024 GW Ranch (Pecos County)](https://datacenterindex.info/campuses/dc-024-gw-ranch-pecos-county/): Tenant per dcmap: Amazon; Fort Stockton, TX; ERCOT; Under construction; 7,650 MW announced, about 1,469 MW expected by 2030; On-site gas; 242.4 MMcf/d gas; 4 of 4 bolts (Gas); confidence C. - [DC-025 Data City Texas](https://datacenterindex.info/campuses/dc-025-data-city-texas/): Energy Abundance Development Corp.; Laredo, TX; ERCOT; Proposed; 5,000 MW announced, about 225 MW expected by 2030; Not disclosed; 16.1 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-026 Sailfish Comanche Circle](https://datacenterindex.info/campuses/dc-026-sailfish-comanche-circle/): Sailfish Digital Ventures; Tolar, TX; ERCOT; Proposed; 5,000 MW announced, about 225 MW expected by 2030; Not disclosed; 16.1 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-027 Meta Hyperion](https://datacenterindex.info/campuses/dc-027-meta-hyperion/): Meta; Richland Parish (Holly Ridge), LA; MISO; Under construction; 5,000 MW announced, about 1,200 MW expected by 2030; Grid, dedicated gas plants; 156.4 MMcf/d gas; 4 of 4 bolts (Grid + gas); confidence B. - [DC-028 Roswell Information Park](https://datacenterindex.info/campuses/dc-028-roswell-information-park/): Roswell Information Park LLC; Roswell, NM; SPP; Proposed; 4,960 MW announced, about 223 MW expected by 2030; Not disclosed; 14.5 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-029 Homer City Energy Campus](https://datacenterindex.info/campuses/dc-029-homer-city-energy-campus/): Homer City Redevelopment; Homer City, PA; PJM; Under construction; 4,500 MW announced, about 864 MW expected by 2030; On-site gas; 142.6 MMcf/d gas; 4 of 4 bolts (Gas); confidence B. - [DC-030 Joule Energy & Data Center Campus](https://datacenterindex.info/campuses/dc-030-joule-energy-and-data-center-campus/): Joule Capital Partners; Holden (Millard County), UT; West: Mountain/Northwest; Under construction; 4,000 MW announced, about 768 MW expected by 2030; On-site gas; 126.8 MMcf/d gas; 4 of 4 bolts (Gas); confidence C. - [DC-031 Caldwell County campuses (PowerHouse / Tract)](https://datacenterindex.info/campuses/dc-031-caldwell-county-campuses-powerhouse-tract/): PowerHouse; Tract; Uhland, TX; ERCOT; Announced; 4,000 MW announced, about 420 MW expected by 2030; Not disclosed; 30.1 MMcf/d gas; 3 of 4 bolts (Grid); confidence D. - [DC-032 Galaxy Project Merlin (Helios II)](https://datacenterindex.info/campuses/dc-032-galaxy-project-merlin-helios-ii/): Galaxy Digital; McGregor, TX; ERCOT; Announced; 3,500 MW announced, about 368 MW expected by 2030; Not disclosed; 26.3 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-033 OpenAI Project Camellia](https://datacenterindex.info/campuses/dc-033-openai-project-camellia/): OpenAI; Effingham County, GA; Southeast utilities; Approved; 3,210 MW announced, about 626 MW expected by 2030; Grid (Georgia Power); 61.2 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-034 Stak Energy North Slope](https://datacenterindex.info/campuses/dc-034-stak-energy-north-slope/): Stak Energy; North Slope, AK; Alaska; Proposed; 3,000 MW announced, about 270 MW expected by 2030; Not disclosed; 31.7 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-035 Amazon Northeast Creek Technology Campus](https://datacenterindex.info/campuses/dc-035-amazon-northeast-creek-technology-campus/): Amazon; Louisa County, VA; PJM; Under construction; 2,700 MW announced, about 1,296 MW expected by 2030; Grid; 101.3 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-036 Google Project Tembo](https://datacenterindex.info/campuses/dc-036-google-project-tembo/): Google; Cheyenne, WY; West: Mountain/Northwest; Under construction; 2,700 MW announced, about 1,296 MW expected by 2030; Not disclosed; 84.4 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-037 AWS Northern Indiana (Hobart)](https://datacenterindex.info/campuses/dc-037-aws-northern-indiana-hobart/): Amazon; Hobart, IN; MISO; Under construction; 2,400 MW announced, about 1,152 MW expected by 2030; Grid; 90.1 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-038 Amazon Project Rainier](https://datacenterindex.info/campuses/dc-038-amazon-project-rainier/): Amazon (for Anthropic); New Carlisle, IN; PJM; Operating, expanding; 2,200 MW announced, about 1,188 MW expected by 2030; Grid; 92.9 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-039 Tract Hanover Technology Park](https://datacenterindex.info/campuses/dc-039-tract-hanover-technology-park/): Tract; Ashland, VA; PJM; Approved; 2,400 MW announced, about 936 MW expected by 2030; Grid (Dominion); 73.2 MMcf/d gas; 4 of 4 bolts (Grid); confidence B. - [DC-040 Adams Fork Data Center Energy Campus](https://datacenterindex.info/campuses/dc-040-adams-fork-data-center-energy-campus/): TransGas Development Systems; Wharncliffe, WV; PJM; Proposed; 2,400 MW announced, about 173 MW expected by 2030; On-site gas; 28.5 MMcf/d gas; 2 of 4 bolts (Gas); confidence D. - [DC-041 Amp Energy East Texas](https://datacenterindex.info/campuses/dc-041-amp-energy-east-texas/): Amp Z; Lufkin, TX; ERCOT; Proposed; 2,100 MW announced, about 189 MW expected by 2030; Not disclosed; 13.5 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-042 Aligned Shippingport (Bruce Mansfield)](https://datacenterindex.info/campuses/dc-042-aligned-shippingport-bruce-mansfield/): Aligned Data Centers; Shippingport, PA; PJM; Under construction; 2,000 MW announced, about 960 MW expected by 2030; Not disclosed; 75.1 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-043 Microsoft Pecos Campus (Project Kilby)](https://datacenterindex.info/campuses/dc-043-microsoft-pecos-campus-project-kilby/): Microsoft; Pecos, TX; ERCOT; Approved; 2,000 MW announced, about 780 MW expected by 2030; On-site gas (Chevron, 20-year PPA); 128.7 MMcf/d gas; 4 of 4 bolts (Gas); confidence B. - [DC-044 Eneus Energy Harlingen](https://datacenterindex.info/campuses/dc-044-eneus-energy-harlingen/): Eneus Energy; Harlingen, TX; ERCOT; Proposed; 2,000 MW announced, about 180 MW expected by 2030; Not disclosed; 12.9 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-045 Rubix Project Ashland](https://datacenterindex.info/campuses/dc-045-rubix-project-ashland/): Rubix Data Centers; Russell, KY; PJM; Proposed; 2,000 MW announced, about 180 MW expected by 2030; Not disclosed; 14.1 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-046 Digital Realty Astra Enterprise Park](https://datacenterindex.info/campuses/dc-046-digital-realty-astra-enterprise-park/): Digital Realty; De Soto, KS; SPP; Announced; 2,000 MW announced, about 420 MW expected by 2030; Not disclosed; 27.4 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-047 Tract TRIC Master-Planned Park](https://datacenterindex.info/campuses/dc-047-tract-tric-master-planned-park/): Tract; Sparks (Storey County), NV; West: Mountain/Northwest; Announced; 2,000 MW announced, about 420 MW expected by 2030; Not disclosed; 27.4 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-048 IREN Sweetwater](https://datacenterindex.info/campuses/dc-048-iren-sweetwater/): IREN; Sweetwater, TX; ERCOT; Under construction; 2,000 MW announced, about 960 MW expected by 2030; Grid; 68.8 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-049 Poolside Project Horizon](https://datacenterindex.info/campuses/dc-049-poolside-project-horizon/): Poolside AI; Fort Stockton, TX; ERCOT; Announced; 2,000 MW announced, about 420 MW expected by 2030; Not disclosed; 30.1 MMcf/d gas; 3 of 4 bolts (Grid); confidence D. - [DC-050 Fundamental Data Ridgeline](https://datacenterindex.info/campuses/dc-050-fundamental-data-ridgeline/): Fundamental Data; Hambleton, WV; PJM; Proposed; 2,000 MW announced, about 180 MW expected by 2030; Not disclosed; 14.1 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-051 Nscale Monarch Compute Campus](https://datacenterindex.info/campuses/dc-051-nscale-monarch-compute-campus/): Nscale; Point Pleasant, WV; PJM; Under construction; 2,000 MW announced, about 960 MW expected by 2030; Not disclosed; 75.1 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-052 Project Bunkhouse](https://datacenterindex.info/campuses/dc-052-project-bunkhouse/): Taurus / Digital Realty; Stilesboro, GA; Southeast utilities; Announced; 1,830 MW announced, about 384 MW expected by 2030; Not disclosed; 37.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-053 Tract Buckeye Tech Corridor](https://datacenterindex.info/campuses/dc-053-tract-buckeye-tech-corridor/): Tract; Buckeye, AZ; West: Desert Southwest; Announced; 1,800 MW announced, about 378 MW expected by 2030; Not disclosed; 29.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-054 Joliet Technology Center](https://datacenterindex.info/campuses/dc-054-joliet-technology-center/): Hillwood / PowerHouse; Joliet, IL; PJM; Announced; 1,800 MW announced, about 378 MW expected by 2030; Not disclosed; 29.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-055 Project Cardinal](https://datacenterindex.info/campuses/dc-055-project-cardinal/): Pioneer Development; Yorkville, IL; PJM; Announced; 1,800 MW announced, about 378 MW expected by 2030; Not disclosed; 29.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-056 Paducah GDP AI Campus](https://datacenterindex.info/campuses/dc-056-paducah-gdp-ai-campus/): Brookfield / NextEra; Kevil, KY; Southeast utilities; Announced; 1,800 MW announced, about 378 MW expected by 2030; Not disclosed; 36.9 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-057 PowerHouse Grand Prairie Campus](https://datacenterindex.info/campuses/dc-057-powerhouse-grand-prairie-campus/): PowerHouse Data Centers; Grand Prairie, TX; ERCOT; Under construction; 1,800 MW announced, about 864 MW expected by 2030; Not disclosed; 61.9 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-058 Stark Hallam Hyperscale](https://datacenterindex.info/campuses/dc-058-stark-hallam-hyperscale/): Stark Power; Hallam, NE; SPP; Announced; 1,700 MW announced, about 357 MW expected by 2030; Not disclosed; 23.3 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-059 Galaxy Helios Campus](https://datacenterindex.info/campuses/dc-059-galaxy-helios-campus/): Galaxy Digital; Afton (Dickens County), TX; ERCOT; Under construction; 1,630 MW announced, about 782 MW expected by 2030; Grid; 56.1 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-060 Tract Silver Springs Park](https://datacenterindex.info/campuses/dc-060-tract-silver-springs-park/): Tract; Silver Springs, NV; West: Mountain/Northwest; Announced; 1,600 MW announced, about 336 MW expected by 2030; Not disclosed; 21.9 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-061 IREN SE Oklahoma Campus](https://datacenterindex.info/campuses/dc-061-iren-se-oklahoma-campus/): IREN; Clayton, OK; SPP; Announced; 1,600 MW announced, about 336 MW expected by 2030; Not disclosed; 21.9 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-062 IREN Woods County Campus](https://datacenterindex.info/campuses/dc-062-iren-woods-county-campus/): IREN; Alva, OK; SPP; Announced; 1,600 MW announced, about 336 MW expected by 2030; Not disclosed; 21.9 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-063 Wildcat Ridge AI Campus](https://datacenterindex.info/campuses/dc-063-wildcat-ridge-ai-campus/): Cornell Realty Management; Archbald, PA; PJM; Announced; 1,600 MW announced, about 336 MW expected by 2030; Not disclosed; 26.3 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-064 Hassayampa Ranch Data Center](https://datacenterindex.info/campuses/dc-064-hassayampa-ranch-data-center/): Arizona Land Consulting; Tonopah, AZ; West: Desert Southwest; Proposed; 1,500 MW announced, about 135 MW expected by 2030; Not disclosed; 10.6 MMcf/d gas; 1 of 4 bolts (Grid); confidence D. - [DC-065 AWS Project Galaxy](https://datacenterindex.info/campuses/dc-065-aws-project-galaxy/): Amazon; Sidney, OH; PJM; Under construction; 1,500 MW announced, about 720 MW expected by 2030; Grid; 56.3 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-066 Stargate Lordstown](https://datacenterindex.info/campuses/dc-066-stargate-lordstown/): OpenAI / SoftBank / Oracle; Lordstown, OH; PJM; Under construction; 1,500 MW announced, about 720 MW expected by 2030; Not disclosed; 56.3 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-067 Cloverleaf Project Open Sky](https://datacenterindex.info/campuses/dc-067-cloverleaf-project-open-sky/): Cloverleaf Infrastructure; Piedmont, OK; SPP; Announced; 1,500 MW announced, about 315 MW expected by 2030; Not disclosed; 20.5 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-068 Core Scientific Pecos AI Campus](https://datacenterindex.info/campuses/dc-068-core-scientific-pecos-ai-campus/): Core Scientific; Pecos, TX; ERCOT; Under construction; 1,500 MW announced, about 720 MW expected by 2030; Not disclosed; 51.6 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-069 Crusoe Victoria AI Factory](https://datacenterindex.info/campuses/dc-069-crusoe-victoria-ai-factory/): Crusoe; Victoria, TX; ERCOT; Announced; 1,500 MW announced, about 315 MW expected by 2030; Not disclosed; 22.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-070 AWS Wilderness Crossing](https://datacenterindex.info/campuses/dc-070-aws-wilderness-crossing/): Amazon; Montford (Orange County), VA; PJM; Announced; 1,500 MW announced, about 315 MW expected by 2030; Not disclosed; 24.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-071 Vantage Frontier (Stargate)](https://datacenterindex.info/campuses/dc-071-vantage-frontier-stargate/): Vantage Data Centers; Shackelford County, TX; ERCOT; Under construction; 1,400 MW announced, about 672 MW expected by 2030; Grid + on-site gas; 73.3 MMcf/d gas; 3 of 4 bolts (Grid + gas); confidence C. - [DC-072 Stargate Michigan 'The Barn'](https://datacenterindex.info/campuses/dc-072-stargate-michigan-the-barn/): Related Digital (OpenAI / Oracle); Saline Township, MI; MISO; Under construction; 1,400 MW announced, about 672 MW expected by 2030; Grid (DTE); 52.5 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-073 Stargate Abilene](https://datacenterindex.info/campuses/dc-073-stargate-abilene/): Crusoe / Oracle / OpenAI; Abilene, TX; ERCOT; Operating, expanding; 1,200 MW announced, about 648 MW expected by 2030; Grid + on-site gas; 61.0 MMcf/d gas; 3 of 4 bolts (Grid); confidence B. - [DC-074 Stargate Milam County (Project Freebird)](https://datacenterindex.info/campuses/dc-074-stargate-milam-county-project-freebird/): SB Energy; Burlington (Milam County), TX; ERCOT; Under construction; 1,200 MW announced, about 576 MW expected by 2030; Not disclosed; 41.3 MMcf/d gas; 3 of 4 bolts (Grid); confidence C. - [DC-075 Stargate Project Jupiter](https://datacenterindex.info/campuses/dc-075-stargate-project-jupiter/): STACK Infrastructure / BorderPlex Digital Assets; Santa Teresa (Doña Ana County), NM; West: Desert Southwest; Under construction; 2,450 MW announced, about 941 MW expected by 2030; On-site fuel cells (Bloom, gas); 114.4 MMcf/d gas; 4 of 4 bolts (Gas); confidence B. - [DC-076 Meta El Paso](https://datacenterindex.info/campuses/dc-076-meta-el-paso/): Meta; El Paso, TX; West: Desert Southwest; Under construction; 1,000 MW announced, about 800 MW expected by 2030; Grid + on-site gas; 82.9 MMcf/d gas; 3 of 4 bolts (Grid + gas); confidence C. - [DC-077 Meta Lebanon](https://datacenterindex.info/campuses/dc-077-meta-lebanon/): Meta; Lebanon, IN; MISO; Under construction; 1,000 MW announced, about 800 MW expected by 2030; Not disclosed; 62.5 MMcf/d gas; 4 of 4 bolts (Grid); confidence C. - [DC-078 Nebius Independence](https://datacenterindex.info/campuses/dc-078-nebius-independence/): Nebius; Independence, MO; SPP; Announced; 1,200 MW announced, about 252 MW expected by 2030; Not disclosed; 16.4 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-079 CloudBurst San Marcos Data Center I](https://datacenterindex.info/campuses/dc-079-cloudburst-san-marcos-data-center-i/): CloudBurst; San Marcos, TX; ERCOT; Announced; 1,200 MW announced, about 252 MW expected by 2030; Not disclosed; 18.1 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-080 Meta Prometheus](https://datacenterindex.info/campuses/dc-080-meta-prometheus/): Meta; New Albany, OH; PJM; Operating, expanding; 1,000 MW announced, about 900 MW expected by 2030; Grid + on-site gas; 82.9 MMcf/d gas; 3 of 4 bolts (Grid + gas); confidence B. - [DC-081 Google / Tenaska SE Nebraska](https://datacenterindex.info/campuses/dc-081-google-tenaska-se-nebraska/): Google; Southeast Nebraska, NE; SPP; Proposed; 1,000 MW announced, about 150 MW expected by 2030; Not disclosed; 9.8 MMcf/d gas; 2 of 4 bolts (Grid); confidence D. - [DC-082 Wonder Valley](https://datacenterindex.info/campuses/dc-082-wonder-valley/): O'Leary Ventures; Greenview (MD), AB; Alberta (AESO); Proposed; 7,500 MW announced, about 338 MW expected by 2030; On-site gas; 55.7 MMcf/d gas; 3 of 4 bolts (Gas); confidence C. - [DC-083 Meta Sturgeon County](https://datacenterindex.info/campuses/dc-083-meta-sturgeon-county/): Meta; Sturgeon County, AB; Alberta (AESO); Announced; 1,000 MW announced, about 350 MW expected by 2030; Dedicated gas plant ($4.6B, Pembina-led); 45.6 MMcf/d gas; 2 of 4 bolts (Grid + gas); confidence C. - [DC-084 TransAlta Keephills data centre](https://datacenterindex.info/campuses/dc-084-transalta-keephills-data-centre/): TransAlta; Keephills (Parkland County), AB; Alberta (AESO); Approved; 230 MW announced, about 150 MW expected by 2030; Grid; 17.5 MMcf/d gas; 1 of 4 bolts (Grid); confidence B. - [DC-085 Digital Realty Kokomo campus](https://datacenterindex.info/campuses/dc-085-digital-realty-kokomo-campus/): Digital Realty; Kokomo (Howard County), IN; MISO; Announced; 1,500 MW announced, about 315 MW expected by 2030; Grid (Duke Energy Indiana); 24.6 MMcf/d gas; 2 of 4 bolts (Grid); confidence C. - [DC-086 TerraWatt Alton (former Alton Steel)](https://datacenterindex.info/campuses/dc-086-terrawatt-alton-former-alton-steel/): TerraWatt; Alton (Madison County), IL; MISO; Proposed; 200 MW announced, about 30 MW expected by 2030; Not disclosed; 2.3 MMcf/d gas; 1 of 4 bolts (Grid); confidence C. - [DC-087 Taylor Technology Campus](https://datacenterindex.info/campuses/dc-087-taylor-technology-campus/): Big Watt Digital + PowerHouse Data Centers; Taylor (Williamson County), TX; ERCOT; Approved; 1,000 MW announced, about 650 MW expected by 2030; On-site gas (behind the meter); 107.3 MMcf/d gas; 4 of 4 bolts (Gas); confidence B. ## Watch list (reported, not yet verified; not counted in totals) - Project Roman (Google (via Intersect Power)), Near Hereford (Deaf Smith County), TX: Not disclosed; Self-supplied gas plant plus wind and solar; gas via NGPL Amarillo Expansion (550,000 Dth/d). - Meitner Energy Center (Google + Intersect Power), Gray and Roberts Counties, TX: Not disclosed; over 1 GW of co-located wind, solar and storage; Renewables with on-site gas for firming. - Google West Memphis (Google), West Memphis, AR: Not disclosed; $4B first phase; Grid, with 600 MW solar and 350 MW battery (Cypress Solar). ## Latest regulatory and legislative actions - Jun 18, 2026: FERC orders six grid operators to file large-load rules. Covers study timelines, cost shifts, co-location and service for flexible loads. Duane Morris - Jul 14, 2026: New York pauses state permits for data centers of 50 MW or more. Executive Order 62, pending a statewide environmental review. Beveridge & Diamond - Jul 31, 2026: PJM files a backstop auction for a 6.8 GW shortfall. Price cap $555/MW-day; results due Dec 2, 2026. PJM sees up to 70 GW of large-load growth by 2038. Utility Dive - Aug 3, 2026: Texas governor orders an audit of every data center in the queue. Projects that don't disclose ownership, finances, water and community impacts can be denied connection. ERCOT paused energization of new 75 MW+ data center and crypto loads; its Sept 3 Batch Zero classifications put 66.4 GW in the base case, about 128 GW for study and 302 GW excluded. Audit reports are due Dec 10. ERCOT · POWER - Aug 5, 2026: Virginia regulators: data centers pay for lines built only for them. Dominion has 200+ transmission projects serving 600+ data centers. WJLA - May 27, 2026: Ohio pauses new data center sales-tax exemptions. The 2025 cost of the exemption was underestimated by more than $1.4 billion. WOSU - Sept 2026: House passes the Ratepayer Protection Act, 417–3. Asks states to consider making large loads pay full cost; does not require it. Stalled in the Senate. ExecutiveGov - Dec 2026: Louisiana PSC decides on seven more gas plants for Meta Hyperion. Docket 32728; ten plants in total. UCS - 2025–2026: 42 of 486 state data center bills became law, in 23 states. Large-load cost rules, water, tax incentives, siting and transparency. Quorum ## Optional - [Sitemap](https://datacenterindex.info/sitemap.xml) - [Original Data Center Tracking Index on deaudits.com](https://deaudits.com/data-center-index/) - [Discovery Energy U.S. Electric Utility Directory](https://deaudits.com/blog/us-electric-utility-directory/)