Campus profile · DC-008

Riot Platforms Rockdale

A crypto-mining / HPC campus by Riot Platforms in Rockdale, TX, on the ERCOT grid. Status: operating.

Announced700 MWFacility / utility service
Expected by 2030700 MWWeighted by build stage
Gas burn50.2 MMcf/dAverage day
Impact rating3 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 700 MW. After phasing to 2030 and weighting by build stage, the index expects about 700 MW running by 2030. That is about 0.8% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 4,599 GWh of electricity a year, roughly what 426,000 US homes use (EIA average of about 10,800 kWh per home), and add about 50.2 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Fact sheet

Index ID
DC-008
Campus
Riot Platforms Rockdale
Developer / tenant
Riot Platforms
Segment
Crypto / HPC
Location
Rockdale, TX
State / province
Texas
Country
United States
Metro
Non-metro
Grid region
ERCOT
Electric utility
TBD
Status
Operating (counts 100% toward 2030)
Online / target
Not disclosed
Announced capacity
700 MW (Facility / utility service)
Expected load by 2030
700 MW (index estimate)
Annual energy at expected load
about 4,599 GWh
Power supply
Grid
Added gas burn, average day
50.2 MMcf/d (index estimate)
Impact rating
Grid (3 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-008" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Riot Platforms Rockdale" (DC-008), https://datacenterindex.info/campuses/dc-008-riot-platforms-rockdale/, updated November 3, 2026.