Sources and audit log

Every source behind the index

All 159 sources referenced on datacenterindex.info, linked to the original, with what each one supports, which campuses it backs, and how the data has changed. Use it to check any figure on the site.

Sources159Linked to the original
Campuses sourced87Each with its own list
Flagged53Secondary, funded or paywalled
Last checkedNov 32026

How we source

  • Every campus starts from at least one public source and carries a confidence grade: A (verified against a primary source), B (several consistent sources), C (one secondary source) or D (conflicting or estimated figures).
  • We prefer primary sources: regulatory dockets, grid operator filings, utility earnings releases, government data and company statements. Trackers and news reports are used to find projects and are replaced with primary sources as we verify.
  • Flags mark sources that are secondary, funded by an interested party, advocacy-aligned, paywalled or could not be retrieved, so readers can weigh them.
  • Figures marked “expected” or “estimated” are Discovery Energy model outputs. The methodology explains how they are calculated.
  • Changes to campus data are logged below with the source that prompted them. Report an error to [email protected].

By type: Government & regulators: 13 · Grid operators: 3 · Utilities & companies: 15 · News: 60 · Trade press & trackers: 20 · Research & analysis: 23 · Law firms: 13 · Advocacy & industry groups: 11 · Reference: 1. Download the full log as CSV.

Source log

Type
Find

PublisherTitleDateTypeUsed for
Baltimore County Department of PlanningData center study report for the Planning BoardJul 2026Government & regulatorsPer-acre tax and jobs comparison; local rules
Georgia Public Service CommissionGeorgia Power filing (document 224483)2026Government & regulatorsGeorgia Power resource planning
Government of AlbertaIs Alberta's grid ready? (data centres)Jul 30, 2026 dataGovernment & regulatorsAESO requests, Phase 1 allocation, BYOG rules
Campuses: DC-083 DC-084
Lawrence Berkeley National Laboratory2024 U.S. Data Center Energy Usage Report (news release)Jan 15, 2025Government & regulators176 TWh in 2023; 2028 projections
Lawrence Berkeley National LaboratoryRate designs for large loadsAug 10, 2026Government & regulatorsLarge-load tariff design
Lawrence Berkeley National LaboratoryLarge-load webinar slidesSept 2, 2026Government & regulatorsLarge-load tariffs
Régie de l'énergie du QuébecDossier R-4333-2026 (data centre tariff)Jun 22, 2026Government & regulatorsQuébec data centre tariff
U.S. Department of EnergyFederal Power Act 202(c) Order 202-26-23 (PJM)May 18, 2026Government & regulatorsEmergency use of data center backup generation
U.S. Department of EnergyFederal Power Act 202(c) Order 202-26-33 (PJM)Jun 30, 2026Government & regulatorsSecond emergency order, extended to July 7
U.S. Energy Information AdministrationElectric Power Annual, Table 8.2: average heat rates2025Government & regulatorsHeat-rate assumptions
U.S. Energy Information AdministrationToday in Energy: combined-cycle utilization and heat ratesn.d.Government & regulatorsNew CCGT heat rate (6,960 Btu/kWh)
U.S. Energy Information AdministrationShort-Term Energy Outlook: electricityOct 2026Government & regulatorsUS demand forecast
U.S. Energy Information AdministrationFAQ: How much electricity does an American home use?n.d.Government & regulatorsHousehold equivalents on campus pages (about 10,800 kWh a year)
AESOPhase II large load integration engagement2026Grid operatorsAlberta Phase 2 framework
ERCOTBatch Zero update (Board item 14)Sept 2026Grid operatorsBatch Zero classifications; energization pause
PJMBoard letter on Critical Issue Fast Path for large load additionsAug 8, 2025Grid operatorsPJM large-load process
AEP (via StockTitan)AEP reports third-quarter 2026 earnings, expands capital planOct 28, 2026Utilities & companies84 GW contracted load through 2031; $100B plan
BenzingaEntergy Q3 2026 earnings call transcriptNov 2026Utilities & companiesEntergy pipeline
Business Wire via Yahoo FinanceBig Watt Digital and PowerHouse announce planning approval for Taylor Technology CampusCompany statementOct 9, 2026Utilities & companiesTaylor Technology Campus
Campuses: DC-087
Calpine SolutionsSpecial report: PJM 2027/28 BRA resultsMarket participant2025Utilities & companiesPJM capacity prices
Discovery EnergyData Center Tracking Index (original edition on deaudits.com)PublisherOct 28, 2026Utilities & companiesPass 1 dataset, methodology and ratings
Discovery EnergyData Center Tracking Index CSV, Pass 1PublisherOct 28, 2026Utilities & companiesPer-campus fields, MW basis, utility, metro and source columns
Discovery EnergyData Center Tracking Index methodologyPublisherOct 28, 2026Utilities & companiesMethod and assumptions
Discovery EnergyData Center Tracking Index impact ratingPublisherOct 28, 2026Utilities & companiesBolt rating scale
Discovery Energydeaudits.com llms.txt (company facts)Publisher2026Utilities & companiesDescription of Discovery Energy
Fermi Inc. (Newswire)Fermi and TensorWave agree to extend closing date to October 31, 2026Company statementSept 22, 2026Utilities & companiesFermi 222 MW lease
Campuses: DC-019
FirstEnergy (SEC Form 8-K)Q3 2026 news releaseOct 27, 2026Utilities & companies7.9 GW contracted large load
GuruFocus via Yahoo FinanceEntergy Q3 2026 earnings call highlightsSecondaryNov 2, 2026Utilities & companiesData center interest, gas transport, Google West Memphis
OracleWe've overhauled Project Jupiter's power planCompany statementJul 1, 2026Utilities & companiesProject Jupiter fuel cells
Campuses: DC-075
The Motley FoolAEP Q3 2026 earnings call transcriptOct 28, 2026Utilities & companiesTake-or-pay ESAs; ERCOT Batch Zero; Piketon
Campuses: DC-021
VoltusPJM 2027/28 capacity auction results for C&IMarket participant2025Utilities & companies$/MW-year for large users
24/7 Wall StAEP Q3 2026 earningsSecondaryOct 28, 2026NewsSuperseded by AEP release
ABC7 AmarilloFermi America releases statement after losing funding from first major tenantDec 12, 2025NewsFermi tenant exit
Campuses: DC-019
AI WeeklyTexas data center boom uses dry-cleaner air permit loopholeSecondary2026NewsAir permits
AI Weekly (Financial Times)47 large US data center projects delayed, withdrawn or blocked in 2026Secondary2026NewsBernstein credible pipeline 35%
Bloomberg TaxWashington State advances rollback of data center tax exemptionsPaywalled2026NewsWashington tax rollback
BNN Bloomberg (Canadian Press)Canada data centre capacity could soar to 20 GW in planned projects: government documentJul 8, 2026NewsCanada pipeline; Meta Sturgeon; Synapse Olds
Campuses: DC-082 DC-083
Business Insider via AOLAI is driving data center power demand2026NewsCampus seed data
Campuses: DC-072 DC-076 DC-077 DC-078 DC-079
Colorado SunColorado Springs data center vote delayed after raucous hearingSept 17, 2026NewsColorado Springs
ConstructConnectNevada regulators approve 362 MW of temporary power projects for data centersSept 21, 2026NewsFleet Data Centers temporary gas plants at TRIC
Campuses: DC-047
Consumer ReportsAI data centers: Big Tech's impact on electric bills, water and more2026NewsBills and water
E&E NewsFERC approves central US grid plan for connecting AI data centersJan 20, 2026NewsSPP 90-day path; SPP peak
E&E NewsLawmakers agree the data center boom shouldn't hurt ratepayers. Now comes the hard part2026NewsRatepayer Protection Act
E&E NewsxAI gets air permit for unauthorized gas turbines2026NewsAir permits
EnergyNowCanada's data centre buildout: special reportSept 2026NewsCanada overview
ExecutiveGovRatepayer Protection Act passes HouseSept 2026NewsH.R. 9340, 417–3
FactCheck.orgData centers and electricity prices: it's not as simple as voters may thinkOct 29, 2026NewsRate-impact evidence; PJM capacity charges
ForbesData centers are a key issue in midterm battleground states as household electric rates soarNov 2, 2026NewsBills and politics
Georgia RecorderGeorgia Power says data center growth will cause electricity demand to triple2026NewsGeorgia Power load growth
GPBGeorgia PSC gives the green light to Georgia Power's data center-spurred expansionDec 19, 2025NewsGeorgia Power ~10 GW approval
GPB500 miles of pipeline to serve data center demand faces legal battleOct 6, 2026NewsMSX and SSE4 lawsuit
Investing.comFirstEnergy Q3 2026 slides: data center demand doublesSecondary; 27 GW figure not in company releaseOct 28, 2026NewsSuperseded by FirstEnergy release
KUT (Austin NPR)Taylor annexes data center site and power plantOct 9, 2026NewsTaylor council vote
Campuses: DC-087
Latitude MediaThird quarter earnings and utilities' data center momentNov 12, 2025News2025 utility baselines; DTE 1.4 GW Barn contract
Campuses: DC-072
Latitude MediaIs gas really winning the AI race?2026NewsHomer City
Campuses: DC-029
Latitude MediaUp to half of the world's data centers may be delayed this year2026NewsAttrition (Sightline)
mgridGroups say Georgia data center's 90 MW pop-up gas plant skipped air permitsJul 1, 2026NewsAir permits
Moneywise via Yahoo FinanceLoudoun County raked in $1.1 billion in tax revenue from data centersAug 23, 2026NewsLoudoun tax base, jobs, JLARC figures
MyChesCoPJM market monitor report2026News$11.11/MWh data center capacity effect
Natural Gas IntelligenceGoogle data center anchors 550,000 Dth/d NGPL natural gas expansion in TexasSept 28, 2026NewsNGPL Amarillo Expansion; Project Roman
Natural Gas IntelligenceFERC clears 19.2 Bcf Leaf River natural gas storage expansion anchored by EQT2026NewsGas storage
Natural Gas WorldVC unveils plan for 7.5 GW data centre in Alberta2025NewsWonder Valley
Campuses: DC-082
NC NewslineThree more NC localities weigh pauses on data centers as developer backs away from Raleigh projectAug 17, 2026NewsNorth Carolina pauses
Nevada CurrentLombardo backs natural gas pipeline expansion for data centersJun 4, 2026NewsNevada gas
Nevada CurrentThird data center gas plant seeks approval as gas pipeline expansion advancesNot retrieved (site blocked automated access)Oct 26, 2026NewsNevada gas plants
NewsChannel 10 (Amarillo)Community members seek answers at Hereford meeting on proposed Google data centerJul 14, 2026NewsProject Roman (watch list)
NewsweekMap: states with the biggest data centers being built2026NewsCampus seed data
Campuses: DC-020 DC-021
POWERAbbott orders full audit of Texas data center interconnection queue, threatens to deny grid accessAug 4, 2026NewsTexas audit; ERCOT queue 474.7 GW; record peak
POWEREntergy will power $4 billion Google data center in ArkansasOct 3, 2025NewsGoogle West Memphis (watch list)
PV TechGoogle and Intersect launch 1 GW-plus clean energy-backed data centre project in TexasJun 5, 2026NewsMeitner Energy Center (watch list)
Richmond BizSenseOne data center project pulled and another delayed in Hanover as supervisors reinstitute equipment taxJun 26, 2026NewsHanover County actions
RTO InsiderERCOT large load interconnection queue hits 410 GWPaywalledApr 1, 2026NewsERCOT queue (April)
S&P Global Commodity InsightsCERAWeek: US producers and top regulator see gas winning resource competition to power AIMar 14, 2025NewsMeta Hyperion gas plants; gas demand ranges
Campuses: DC-027
Southern Business & DevelopmentHanover County, Va. OKs 1,200-acre data center project near AshlandApr 4, 2024NewsTract Hanover rezoning
Campuses: DC-039
Spectrum NewsState Sen. Kristen Gonzalez urges Gov. Hochul to sign data center billAug 27, 2026NewsNY bill status
St. Louis Public RadioTerraWatt data center proposal for the former Alton Steel siteOct 21, 2026NewsTerraWatt Alton
Campuses: DC-086
T&D WorldPJM Board outlines plans to integrate large loads in 2026Jan 22, 2026NewsPJM CIFP decision
TechRadarUS utilities are making AI data centers prove they exist2026NewsAttrition; market monitor 42%
Texas TribuneTexas data centers, AI power plants and state pollution permitsJul 9, 2026NewsStargate Abilene turbines
Campuses: DC-073
Texas TribuneEast Texas data center withdrawnJul 23, 2026NewsHenderson County withdrawal
The HubAlberta Utilities Commission rejects gas plant for Olds data centre complexAug 19, 2026NewsSynapse Olds rejection
The LogicAESO large-load allocation2026NewsTransAlta Keephills 230 MW
Campuses: DC-084
The Next WebMeta details Prometheus, the Ohio supercluster heading for 1 million GPUsOct 20, 2026NewsPrometheus first phase live
Campuses: DC-080
Tom's HardwareLocal opposition blocked $68 billion of data center projects in Q2 20262026NewsData Center Watch Q2
Utility DiveSouthern Co. contracted large load reaches 17 GWAug 4, 2026NewsSouthern contracts; OpenAI 3.2 GW Georgia Power contract
Campuses: DC-033
Utility DivePJM files backstop capacity auction at FERCAug 3, 2026News6.8 GW shortfall; $555 cap; ER26-3380
Virginia Business (Reuters)Dominion Energy beats profit estimates on Virginia data center demandJul 31, 2026NewsDominion 53.8 GW contracted capacity
WFAENC legislative leaders support rolling back data center sales tax exemptionsMay 8, 2026NewsNorth Carolina tax
WJLAData centers in Virginia ordered to pay for transmission upgradesAug 5, 2026NewsVirginia SCC order
WOSUGov. DeWine freezes controversial data center tax break, for nowMay 27, 2026NewsOhio tax exemption pause
WWNOAdvocates cite lack of transparency, rising costs as regulators fast-track second Meta data centerApr 21, 2026NewsMeta Hyperion
Campuses: DC-027
BaxtelTaylor approves 1 GW gas-fired data center campus for Big Watt and PowerHouseOct 15, 2026Trade press & trackersTaylor behind-the-meter gas
Campuses: DC-087
BaxtelDigital Realty picks Kokomo for 1 GW campus, its first in IndianaOct 17, 2026Trade press & trackersDigital Realty Kokomo
Campuses: DC-085
Blackridge ResearchUpcoming largest data center projects in the United StatesSecondaryaccessed Oct 2026Trade press & trackersCampus seed data
Campuses: DC-019 DC-033 DC-036 DC-059 DC-071 DC-072 DC-074
Blackridge ResearchLatest list of new data center construction projectsSecondarySept 2026Trade press & trackersCandidate discovery
BrightlioLargest data centers in the USSecondaryaccessed Oct 2026Trade press & trackersCampus cross-checks
Campuses: DC-037
Converge DigestFermi America resets timeline for Project Matador2026Trade press & trackersFermi timeline
Campuses: DC-019
Data Center CensusLatest project votes, permits and lawsuitsaccessed Nov 2026Trade press & trackersLocal approvals tracking
Data Center DynamicsMeta details Ohio Prometheus data center campus, with first phase liveNot retrieved (site blocked automated access); confirmed via The Next Web2026Trade press & trackersPrometheus
Campuses: DC-080
Data Center DynamicsDigital Realty eyes gigawatt-scale data center site outside Indianapolis, IndianaNot retrieved; confirmed via Baxtel2026Trade press & trackersDigital Realty Kokomo
Campuses: DC-085
Data Center DynamicsGigawatt-scale data center proposed for steel mill in IllinoisNot retrieved; resolved via St. Louis Public Radio (200 MW)2026Trade press & trackersTerraWatt Alton
Campuses: DC-086
Data Center KnowledgeNew data center developments: July 2026Jul 2026Trade press & trackersCandidate discovery
dcmap.usLargest US data centers by reported powerSecondaryaccessed Oct 2026Trade press & trackersCampus seed data (MW, status)
Campuses: DC-001 DC-002 DC-003 DC-004 DC-005 DC-006 DC-007 DC-008 DC-009 DC-010 DC-011 DC-012 +29 more
Electrical Industry News (DC Byte)Canada data centre market2026Trade press & trackersCanada market size; Wonder Valley
Campuses: DC-082
ElectricchoiceU.S. data center trackerSecondaryaccessed Oct 2026Trade press & trackersCampus seed data; cross-checks
Campuses: DC-009 DC-021 DC-022 DC-023 DC-025 DC-026 DC-030 DC-031 DC-032 DC-034 DC-035 DC-036 +28 more
ElectricchoiceData center moratoriumsSecondaryaccessed Nov 2026Trade press & trackersMoratorium tracking
ercotqueue.comLarge-load interconnection queue, by sectorSecondaryaccessed Nov 2026Trade press & trackersERCOT queue tracking
Pipeline & Gas JournalWilliams secures $5.34 billion for gas-fired power projectsJul 13, 2026Trade press & trackersWilliams behind-the-meter projects
Smarter LaborThe gigawatt era: inside the 5 largest data center projects in America in 2026Secondary2026Trade press & trackersCampus seed data
Campuses: DC-038 DC-073 DC-080
StartBusinessByStateData center tax break tracker: every 2025–26 state billSecondary2026Trade press & trackersTax incentive bills
SueDataCenters.org (Theory Road LLC)Cancelled data center projects: 162 US sites, 14.1 GWAdvocacy-adjacent (legal-services marketing)Nov 1, 2026Trade press & trackersCancellations and withdrawals
ai2.workStates rewrite utility tariffs to make AI data centers pay upSecondary2026Research & analysisLarge-load tariffs
ai2.workLarge-load tariffs: the utility rules reshaping AI data centersSecondary2026Research & analysisLarge-load tariffs
Civic IQWhere are data centers opening and how much are cities making? 2025 municipal revenue analysisJan 6, 2026Research & analysisMunicipal revenue
CleanviewBehind-the-meter data centers report2026Research & analysisOn-site generation counts; xAI turbines
Campuses: DC-004
Data Center WatchQ1 2026 report2026Research & analysisLocal opposition, projects blocked or delayed
DistilledData center developers want to build behind the meter2026Research & analysisProject Jupiter pipeline
Campuses: DC-075
E3 (for the Data Center Coalition)Understanding the drivers of rising electricity rates and the role of data centersIndustry-fundedMay 2026Research & analysisRate-impact evidence
EnverusData center gas demand2026Research & analysis1 GW on gas ≈ 140 MMcf/d
EnverusOff the grid, on the gasJul 2026Research & analysis62 GW by 2030; 40% behind the meter
Environ EnergyPJM 2028/29 capacity auction2026Research & analysis$6.3B (38%) attributed to data centers
EPRIRegulatory update (Dominion GS-5)2026Research & analysisGS-5 tariff terms
execgraphTexas data center power procurement 2026: 75,089 MW pipelineSecondary; superseded for queue size2026Research & analysisERCOT queue (Pass 1); Abilene expansion
Exponential IndustryData center power roadmapSecondary2026Research & analysisMeta Prometheus on-site gas
Campuses: DC-080
IEEFAExcessive forecasts of data center growth are behind the push to build two large natural gas pipelines in the SoutheastAdvocacy-aligned researchJun 25, 2026Research & analysisMSX and SSE4 pipelines
itkUS data centres: power sourcesSecondary2026Research & analysisOn-site power details
Campuses: DC-071 DC-076
mjbommar (independent dataset)Moratorium nation: data center moratoria datasetApr 30, 2026Research & analysisLocal moratoria
Modo EnergyPJM load forecast and data centers2026Research & analysisPJM accepted 34 GW of 60 GW submitted
Modo EnergyERCOT data center buildout forecast, October 2026Oct 21, 2026Research & analysisERCOT 92 GW advanced pipeline; Pecos 2.7 GW gas
Campuses: DC-043
MultiStateState data center legislation in 2026 tackles energy and tax issuesFeb 20, 2026Research & analysisLegislation overview
Ohio River Valley InstituteData centers are driving pipeline expansions and production growth in AppalachiaAdvocacy-aligned researchJul 1, 2025Research & analysisAppalachian pipeline list
QuorumQuorum tracked 486 data center measures in 2025–2026; only 42 became lawOct 26, 2026Research & analysisState legislation counts and enacted laws
Rutgers NJ State Policy LabAre data centers raising your electric bill? Mostly not. Yet.2026Research & analysisRate-impact evidence
SoftwareSeniWhy so much US AI data centre capacity is delayed or cancelledSecondary2026Research & analysisDelays; Project Jupiter
Beveridge & DiamondNew York enacts first statewide moratorium on data centers (EO 62)Aug 5, 2026Law firmsNY Executive Order 62
BLGData centre regulation in Québec: from honeyed promise to iron controlJul 2026Law firmsQuébec rules and tariff
BLGData centre regulation in OntarioJul 2026Law firmsOntario rules (Bill 40, IESO)
Crowell & MoringDOE directs FERC to act on large load interconnectionsOct 2025Law firmsDOE directive to FERC
DLA PiperNew York State Legislature passes first-in-the-nation data center moratoriumJul 2026Law firmsNY S10642/A11560
Duane MorrisFERC acts to advance data center and large load integration in six RTO regionsJun 23, 2026Law firmsFERC show cause orders
Gibson DunnDOE's emergency order signals new role for data centers' backup powerMay 2026Law firmsDOE 202(c) analysis
Gowling WLGPower shifts in Canada's data centre market2026Law firmsCanada market
Greenberg TraurigTexas Senate Bill 6 update: proposed interconnection standardsMar 2026Law firmsTexas SB 6 rules
Mondaq (Canadian law firm article)Data Centre West 2026: Alberta's digital infrastructure moment has arrived2026Law firmsAlberta requests; Meta Sturgeon
Campuses: DC-083
OrrickMicrosoft expands global data center capacity with 2 GW data center and co-located power facility in West TexasCounsel to MicrosoftJul 2, 2026Law firmsMicrosoft Pecos 2 GW; Chevron 20-year PPA
Campuses: DC-043
Perkins CoieSB 6 implementation shaping data center future in Texas2026Law firmsTexas SB 6 rules
VenableData center tax incentives under pressureJun 2026Law firmsTax incentives
American Public Power AssociationDOE authorizes PJM to deploy backup generation at data centers and other major facilitiesIndustry groupMay 19, 2026Advocacy & industry groupsDOE Order 202-26-23
CeresBehind-the-meter power: why air quality matters for data centre deploymentAdvocacyJun 25, 2026Advocacy & industry groupsAir permits
Citizens Utility BoardSustained high PJM capacity prices ramp up urgency for data center reformConsumer advocateJul 15, 2026Advocacy & industry groupsPJM capacity prices
Data Center CoalitionE3 white paper summaryIndustry groupMay 2026Advocacy & industry groupsRate-impact evidence
EarthjusticeAdvocates appeal Louisiana PSC decision on Meta data centerAdvocacy2026Advocacy & industry groupsMeta Hyperion
Campuses: DC-027
EarthjusticeNew report examines how AI data centers are increasing electricity costsAdvocacy2026Advocacy & industry groupsRate-impact evidence
Edison Electric InstituteList of large customer projects and tariffsIndustry group2026Advocacy & industry groupsLarge-load tariffs by state
Environmental Defense FundTexas tries to answer key questions about upcoming data center boomAdvocacyJul 14, 2026Advocacy & industry groupsTexas SB 6
NetChoiceOne data center, $290 million for the county that lands it (Kentucky report)Industry-funded2026Advocacy & industry groupsLocal tax revenue claims
Southern Environmental Law CenterPSC unanimously votes to approve Georgia Power's data center planAdvocacyDec 19, 2025Advocacy & industry groupsGeorgia PSC approval
Union of Concerned ScientistsLouisiana regulators fast-track seven-gas-plant proposal for Meta data centerAdvocacyApr 15, 2026Advocacy & industry groupsMeta Hyperion gas plants; LPSC Docket 32728
Campuses: DC-027
WikipediaColossus (supercomputer)Tertiaryaccessed Oct 2026ReferencexAI Colossus background

Sources by campus

IDCampusSourcesConf.
DC-001TECfusions Keystone Connectdcmap.usD
DC-002Microsoft Fairwater 1dcmap.usB
DC-003Google Project Zodiacdcmap.usB
DC-004xAI Colossus 1 + 2dcmap.us · CleanviewB
DC-005Riot Platforms Corsicanadcmap.usC
DC-006IREN Childressdcmap.usC
DC-007Atlas Power Willistondcmap.usC
DC-008Riot Platforms Rockdaledcmap.usC
DC-009Microsoft Fairwater Atlantadcmap.us · ElectricchoiceC
DC-010Bitdeer Texasdcmap.usC
DC-011Tesla Cortex 2 (Giga Texas)dcmap.usC
DC-012TA Realty Leesburg campusdcmap.usC
DC-013Core Scientific Muskogee 2dcmap.usC
DC-014STACK NVA02dcmap.usC
DC-015Data Journey The Bunkerdcmap.usD
DC-016Core Scientific Dentondcmap.usC
DC-017Compass Red Oak DFW IIIdcmap.usC
DC-018Hyperscale Data Michigandcmap.usD
DC-019Fermi America Project Matador (HyperGrid)Blackridge Research · dcmap.us · ABC7 Amarillo · Converge Digest · Fermi Inc. (Newswire)D
DC-020Creekstone Delta Gigasitedcmap.us · NewsweekC
DC-021PORTS Technology CampusElectricchoice · Newsweek · The Motley FoolC
DC-022Stratos AI Data Center CampusElectricchoiceD
DC-023New Era Lea County Data Centerdcmap.us · ElectricchoiceD
DC-024GW Ranch (Pecos County)dcmap.usC
DC-025Data City Texasdcmap.us · ElectricchoiceD
DC-026Sailfish Comanche Circledcmap.us · ElectricchoiceD
DC-027Meta Hyperiondcmap.us · S&P Global Commodity Insights · Union of Concerned Scientists · WWNO · EarthjusticeB
DC-028Roswell Information Parkdcmap.usD
DC-029Homer City Energy Campusdcmap.us · Latitude MediaB
DC-030Joule Energy & Data Center Campusdcmap.us · ElectricchoiceC
DC-031Caldwell County campuses (PowerHouse / Tract)dcmap.us · ElectricchoiceD
DC-032Galaxy Project Merlin (Helios II)ElectricchoiceD
DC-033OpenAI Project Camelliadcmap.us · Blackridge Research · Utility DiveB
DC-034Stak Energy North SlopeElectricchoiceD
DC-035Amazon Northeast Creek Technology Campusdcmap.us · ElectricchoiceC
DC-036Google Project TemboBlackridge Research · ElectricchoiceC
DC-037AWS Northern Indiana (Hobart)Electricchoice · BrightlioC
DC-038Amazon Project RainierSmarter LaborC
DC-039Tract Hanover Technology Parkdcmap.us · Electricchoice · Southern Business & DevelopmentB
DC-040Adams Fork Data Center Energy Campusdcmap.usD
DC-041Amp Energy East Texasdcmap.usD
DC-042Aligned Shippingport (Bruce Mansfield)dcmap.usC
DC-043Microsoft Pecos Campus (Project Kilby)dcmap.us · Electricchoice · Orrick · Modo EnergyB
DC-044Eneus Energy Harlingendcmap.usD
DC-045Rubix Project Ashlanddcmap.usD
DC-046Digital Realty Astra Enterprise ParkElectricchoiceC
DC-047Tract TRIC Master-Planned ParkElectricchoice · ConstructConnectC
DC-048IREN SweetwaterElectricchoiceC
DC-049Poolside Project HorizonElectricchoiceD
DC-050Fundamental Data RidgelineElectricchoiceD
DC-051Nscale Monarch Compute CampusElectricchoice · dcmap.usC
DC-052Project BunkhouseElectricchoiceC
DC-053Tract Buckeye Tech CorridorElectricchoiceC
DC-054Joliet Technology CenterElectricchoiceC
DC-055Project CardinalElectricchoiceC
DC-056Paducah GDP AI CampusElectricchoiceC
DC-057PowerHouse Grand Prairie CampusElectricchoiceC
DC-058Stark Hallam HyperscaleElectricchoiceD
DC-059Galaxy Helios CampusElectricchoice · Blackridge ResearchB
DC-060Tract Silver Springs ParkElectricchoiceC
DC-061IREN SE Oklahoma CampusElectricchoiceC
DC-062IREN Woods County CampusElectricchoiceC
DC-063Wildcat Ridge AI CampusElectricchoiceC
DC-064Hassayampa Ranch Data CenterElectricchoiceD
DC-065AWS Project GalaxyElectricchoiceC
DC-066Stargate LordstownElectricchoiceC
DC-067Cloverleaf Project Open SkyElectricchoiceC
DC-068Core Scientific Pecos AI CampusElectricchoiceC
DC-069Crusoe Victoria AI FactoryElectricchoiceC
DC-070AWS Wilderness CrossingElectricchoiceC
DC-071Vantage Frontier (Stargate)Blackridge Research · itkC
DC-072Stargate Michigan 'The Barn'Blackridge Research · Business Insider via AOL · Latitude MediaB
DC-073Stargate AbileneSmarter Labor · Texas TribuneB
DC-074Stargate Milam County (Project Freebird)Blackridge ResearchC
DC-075Stargate Project Jupiterdcmap.us · Distilled · OracleB
DC-076Meta El PasoBusiness Insider via AOL · itkC
DC-077Meta LebanonBusiness Insider via AOLC
DC-078Nebius IndependenceBusiness Insider via AOLC
DC-079CloudBurst San Marcos Data Center IBusiness Insider via AOLC
DC-080Meta PrometheusSmarter Labor · Exponential Industry · The Next Web · Data Center DynamicsB
DC-081Google / Tenaska SE Nebraskadcmap.usD
DC-082Wonder ValleyNatural Gas World · Electrical Industry News (DC Byte) · BNN Bloomberg (Canadian Press)C
DC-083Meta Sturgeon CountyMondaq (Canadian law firm article) · Government of Alberta · BNN Bloomberg (Canadian Press)C
DC-084TransAlta Keephills data centreThe Logic · Government of AlbertaB
DC-085Digital Realty Kokomo campusBaxtel · Data Center DynamicsC
DC-086TerraWatt Alton (former Alton Steel)St. Louis Public Radio · Data Center DynamicsC
DC-087Taylor Technology CampusBusiness Wire via Yahoo Finance · KUT (Austin NPR) · BaxtelB

Dataset change log

DateCampusChangePrompted by
Nov 3, 2026DC-033 OpenAI Project CamelliaAnnounced → Approved; 337 → 626 MW expected; 2 → 3 bolts; confidence C → BUtility Dive
Nov 3, 2026DC-075 Stargate Project JupiterSupply → Bloom fuel cells; confidence C → BOracle
Nov 3, 2026DC-027 Meta HyperionNote: seven more gas plants proposed (10 total, ~7.5 GW); numbers unchanged pending Dec 2026 decisionUnion of Concerned Scientists
Nov 3, 2026DC-072 Stargate MichiganSupply → Grid (DTE); confidence C → BLatitude Media
Nov 3, 2026DC-019 Fermi Project MatadorConfidence C → D; tenant notesABC7 Amarillo
Nov 3, 2026DC-083 Meta Sturgeon CountySupply → dedicated gas plant; gas 41.0 → 45.6 MMcf/dGovernment of Alberta
Nov 3, 2026DC-043 Microsoft PecosAnnounced → Approved; on-site gas; 420 → 780 MW; 3 Grid → 4 Gas; confidence C → BOrrick
Nov 3, 2026DC-039 Tract HanoverAnnounced → Approved; 504 → 936 MW; 3 → 4 bolts; confidence C → BSouthern Business & Development
Nov 3, 2026DC-085 Digital Realty KokomoAdded: Announced, 1,500 MW, 315 MW expected, 2 boltsBaxtel
Nov 3, 2026DC-086 TerraWatt AltonAdded: Proposed, 200 MW, 30 MW expected, 1 boltSt. Louis Public Radio
Nov 3, 2026DC-087 Taylor Technology CampusAdded from watch list: Approved, 1,000 MW, 650 MW expected, on-site gas, 4 boltsKUT (Austin NPR)
Oct 28, 2026AllPass 1 published on deaudits.com: 84 campusesDiscovery Energy

Verification log, November 3, 2026

Item checkedResultSource
AEP 84 GW contracted loadConfirmedAEP (via StockTitan)
FirstEnergy contracted vs pipelineCorrected to 7.9 GW contracted + ~4 GW in negotiation; 27 GW figure droppedFirstEnergy (SEC Form 8-K)
Digital Realty Indianapolis siteConfirmed as Kokomo, IN; added as DC-085Baxtel
Illinois steel mill siteResolved as TerraWatt Alton (200 MW); added as DC-086St. Louis Public Radio
Meta Prometheus first phaseConfirmed live (Oct 19, 2026)The Next Web
Nevada data center gas plants362 MW temporary plants approved (Sept 2026); noted on DC-047ConstructConnect
Microsoft Pecos dedicated gasConfirmed: Chevron 20-year PPA; DC-043 updatedOrrick
Tract Hanover statusRezoned April 2024; DC-039 raised to ApprovedSouthern Business & Development
Fermi Project MatadorTensorWave 222 MW lease pending (closing extended to Oct 31, 2026)Fermi Inc. (Newswire)
ERCOT queue sizeUpdated from ERCOT Batch Zero filingERCOT
New York S10642/A11560Still awaiting the governor as of Aug 27, 2026Spectrum News
Second DOE 202(c) orderConfirmed: 202-26-33, June 30 to July 7, 2026U.S. Department of Energy
Taylor Technology CampusPromoted from watch list (DC-087)KUT (Austin NPR)
Synapse Olds campusDropped: gas plant rejected by the AUCThe Hub

Retrieval notes

These pages could not be retrieved by our tools when checked; each fact they were cited for was confirmed elsewhere or left marked as unverified: Nevada Current, Third data center gas plant seeks approval as gas pipeline expansion advances; Data Center Dynamics, Meta details Ohio Prometheus data center campus, with first phase live; Data Center Dynamics, Digital Realty eyes gigawatt-scale data center site outside Indianapolis, Indiana; Data Center Dynamics, Gigawatt-scale data center proposed for steel mill in Illinois.