Core Scientific Pecos AI Campus
A crypto-mining / HPC campus by Core Scientific in Pecos, TX, on the ERCOT grid. Status: under construction.
Grid and gas impact
At full buildout this campus is announced at 1,500 MW. After phasing to 2030 and weighting by build stage, the index expects about 720 MW running by 2030. That is about 0.8% of the ERCOT record peak of July 22, 2026 (91,089 MW).
At that level it would use about 4,730 GWh of electricity a year, roughly what 438,000 US homes use (EIA average of about 10,800 kWh per home), and add about 51.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.
Fact sheet
- Index ID
- DC-068
- Campus
- Core Scientific Pecos AI Campus
- Developer / tenant
- Core Scientific
- Segment
- Crypto / HPC
- Location
- Pecos, TX
- State / province
- Texas
- Country
- United States
- Metro
- Non-metro
- Grid region
- ERCOT
- Electric utility
- TBD
- Status
- Under construction (counts 80% toward 2030)
- Online / target
- Not disclosed
- Announced capacity
- 1,500 MW (Campus potential)
- Expected load by 2030
- 720 MW (index estimate)
- Annual energy at expected load
- about 4,730 GWh
- Power supply
- Not disclosed
- Added gas burn, average day
- 51.6 MMcf/d (index estimate)
- Impact rating
- (3 of 4; scale)
- Confidence
- C (One secondary source)
- Last reviewed
- November 3, 2026
Sources
- U.S. data center trackerElectricchoice · accessed Oct 2026Secondary
Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-068" in the subject.
How to cite
Data Center Index (datacenterindex.info), Discovery Energy. "Core Scientific Pecos AI Campus" (DC-068), https://datacenterindex.info/campuses/dc-068-core-scientific-pecos-ai-campus/, updated November 3, 2026.