Campus profile · DC-031

Caldwell County campuses (PowerHouse / Tract)

A developer campus by PowerHouse; Tract in Uhland, TX, on the ERCOT grid. Status: announced.

Announced4,000 MWCampus potential
Expected by 2030420 MWWeighted by build stage
Gas burn30.1 MMcf/dAverage day
Impact rating3 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 4,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 420 MW running by 2030. That is about 0.5% of the ERCOT record peak of July 22, 2026 (91,089 MW).

At that level it would use about 2,759 GWh of electricity a year, roughly what 256,000 US homes use (EIA average of about 10,800 kWh per home), and add about 30.1 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Research note. Electricchoice lists PowerHouse Caldwell County (4 GW) and Tract Caldwell Valley (2 GW); dcmap lists Tract at 4 GW. Kept as one row pending dedup.

Fact sheet

Index ID
DC-031
Campus
Caldwell County campuses (PowerHouse / Tract)
Developer / tenant
PowerHouse; Tract
Segment
Developer campus
Location
Uhland, TX
State / province
Texas
Country
United States
Metro
Austin
Grid region
ERCOT
Electric utility
TBD
Status
Announced (counts 35% toward 2030)
Online / target
Not disclosed
Announced capacity
4,000 MW (Campus potential)
Expected load by 2030
420 MW (index estimate)
Annual energy at expected load
about 2,759 GWh
Power supply
Not disclosed
Added gas burn, average day
30.1 MMcf/d (index estimate)
Impact rating
Grid (3 of 4; scale)
Confidence
D (Conflicting or estimated figures)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-031" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Caldwell County campuses (PowerHouse / Tract)" (DC-031), https://datacenterindex.info/campuses/dc-031-caldwell-county-campuses-powerhouse-tract/, updated November 3, 2026.