Campus profile · DC-027

Meta Hyperion

A hyperscale AI campus by Meta in Richland Parish (Holly Ridge), LA, on the MISO grid. Status: under construction.

Announced5,000 MWCampus potential
Expected by 20301,200 MWWeighted by build stage
Gas burn156.4 MMcf/dAverage day
Impact rating4 of 4Grid + gas driven

Grid and gas impact

At full buildout this campus is announced at 5,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 1,200 MW running by 2030.

At that level it would use about 7,884 GWh of electricity a year, roughly what 731,000 US homes use (EIA average of about 10,800 kWh per home), and add about 156.4 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its grid and gas scores tie: it draws on both the transmission grid and dedicated or on-site gas supply. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Latest update. Entergy seeks 7 more gas plants (10 in total, about 7.5 GW); Louisiana PSC decision due Dec 2026 (Docket 32728).

Research note. Entergy building three combined-cycle units (~2.3 GW) for the campus (S&P). Electricchoice lists 2 GW (initial phase).

Fact sheet

Index ID
DC-027
Campus
Meta Hyperion
Developer / tenant
Meta
Segment
Hyperscale AI
Location
Richland Parish (Holly Ridge), LA
State / province
Louisiana
Country
United States
Metro
Non-metro
Grid region
MISO
Electric utility
Entergy Louisiana
Status
Under construction (counts 80% toward 2030)
Online / target
2028
Announced capacity
5,000 MW (Campus potential)
Expected load by 2030
1,200 MW (index estimate)
Annual energy at expected load
about 7,884 GWh
Power supply
Grid, dedicated gas plants
Added gas burn, average day
156.4 MMcf/d (index estimate)
Impact rating
Grid + gas (4 of 4; scale)
Confidence
B (Several consistent sources)
Last reviewed
November 3, 2026