United States · state
Data centers in Louisiana
1 tracked campus of 100 MW or more in Louisiana, on the MISO grid. The largest expected load by 2030 is Meta Hyperion.
Campuses1100 MW or more
Announced5,000 MWAt full buildout
Expected by 20301,200 MWWeighted by build stage
Gas burn156 MMcf/dAverage day
Campuses in Louisiana
| Campus | Location | Grid region | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|---|
| Meta HyperionMeta · DC-027 | Richland Parish (Holly Ridge), LA | MISO | Under construction | 5,000 | 1,200 | Grid, dedicated gas plants | 156.4 | B |
Expected load and gas burn are index estimates. See the methodology and the source log.