United States · state

Data centers in Louisiana

1 tracked campus of 100 MW or more in Louisiana, on the MISO grid. The largest expected load by 2030 is Meta Hyperion.

Campuses1100 MW or more
Announced5,000 MWAt full buildout
Expected by 20301,200 MWWeighted by build stage
Gas burn156 MMcf/dAverage day

Campuses in Louisiana

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Meta HyperionMeta · DC-027Richland Parish (Holly Ridge), LAMISOUnder construction5,0001,200Grid, dedicated gas plants156.4Grid + gasB

Expected load and gas burn are index estimates. See the methodology and the source log.