Grid region

Data centers on the MISO grid

The Midcontinent Independent System Operator runs the grid across 15 states from Louisiana to Michigan and the Canadian province of Manitoba.

Campuses73 four-bolt, 2 three-bolt
Announced12,980 MWAt full buildout
Expected by 20304,968 MWPeak not yet calibrated
Gas burn451 MMcf/dAverage day

What is happening

  • Entergy Louisiana has asked to add seven gas plants for Meta's Hyperion campus, ten in total and about 7.5 GW; the Louisiana PSC decides in December 2026 (Docket 32728).
  • Entergy reports 7–12 GW of data center interest and signed gas transport for 1.325 Bcf/d to fuel 10 new combined-cycle plants.
  • MISO is developing an expedited process for large-load and resource additions.

Load and gas by 2030

Expected load by 2030
4,968 MW
Grid-served
4,968 MW
On-site (behind the meter)
0 MW
Share of system peak
Peak not yet calibrated
Added gas burn
451 MMcf/d average day
Gas share of new supply (assumption)
60% (method)

Campuses on this grid

CampusLocationStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
Meta HyperionMeta · DC-027Richland Parish (Holly Ridge), LAUnder construction5,0001,200Grid, dedicated gas plants156.4Grid + gasB
AWS Northern Indiana (Hobart)Amazon · DC-037Hobart, INUnder construction2,4001,152Grid90.1GridC
Meta LebanonMeta · DC-077Lebanon, INUnder construction1,000800Not disclosed62.5GridC
Microsoft Fairwater 1Microsoft · DC-002Mount Pleasant, WIOperating, expanding1,480799Grid62.5GridB
Stargate Michigan 'The Barn'Related Digital (OpenAI / Oracle) · DC-072Saline Township, MIUnder construction1,400672Grid (DTE)52.5GridB
Digital Realty Kokomo campusDigital Realty · DC-085Kokomo (Howard County), INAnnounced1,500315Grid (Duke Energy Indiana)24.6GridC
TerraWatt Alton (former Alton Steel)TerraWatt · DC-086Alton (Madison County), ILProposed20030Not disclosed2.3GridC