Campus profile · DC-072

Stargate Michigan 'The Barn'

A hyperscale AI campus by Related Digital (OpenAI / Oracle) in Saline Township, MI, on the MISO grid. Status: under construction.

Announced1,400 MWCampus potential
Expected by 2030672 MWWeighted by build stage
Gas burn52.5 MMcf/dAverage day
Impact rating3 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,400 MW. After phasing to 2030 and weighting by build stage, the index expects about 672 MW running by 2030.

At that level it would use about 4,415 GWh of electricity a year, roughly what 409,000 US homes use (EIA average of about 10,800 kWh per home), and add about 52.5 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 3 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Latest update. DTE signed a 1.4 GW contract, its first data center contract.

Fact sheet

Index ID
DC-072
Campus
Stargate Michigan 'The Barn'
Developer / tenant
Related Digital (OpenAI / Oracle)
Segment
Hyperscale AI
Location
Saline Township, MI
State / province
Michigan
Country
United States
Metro
Ann Arbor
Grid region
MISO
Electric utility
DTE
Status
Under construction (counts 80% toward 2030)
Online / target
Not disclosed
Announced capacity
1,400 MW (Campus potential)
Expected load by 2030
672 MW (index estimate)
Annual energy at expected load
about 4,415 GWh
Power supply
Grid (DTE)
Added gas burn, average day
52.5 MMcf/d (index estimate)
Impact rating
Grid (3 of 4; scale)
Confidence
B (Several consistent sources)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-072" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Stargate Michigan 'The Barn'" (DC-072), https://datacenterindex.info/campuses/dc-072-stargate-michigan-the-barn/, updated November 3, 2026.