Digital Realty Kokomo campus
A colocation campus by Digital Realty in Kokomo (Howard County), IN, on the MISO grid. Status: announced.
Grid and gas impact
At full buildout this campus is announced at 1,500 MW. After phasing to 2030 and weighting by build stage, the index expects about 315 MW running by 2030.
At that level it would use about 2,070 GWh of electricity a year, roughly what 192,000 US homes use (EIA average of about 10,800 kWh per home), and add about 24.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.
Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 2 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.
Latest update. New Nov 3, 2026: about 1 GW IT (1.5 GW power) on 476 acres; council opened industrial sites to data centers Sept 14, 2026; build-out to 2033.
Fact sheet
- Index ID
- DC-085
- Campus
- Digital Realty Kokomo campus
- Developer / tenant
- Digital Realty
- Segment
- Colocation
- Location
- Kokomo (Howard County), IN
- State / province
- Indiana
- Country
- United States
- Metro
- Kokomo
- Grid region
- MISO
- Electric utility
- Duke Energy Indiana
- Status
- Announced (counts 35% toward 2030)
- Online / target
- 2027–2033
- Announced capacity
- 1,500 MW (Facility power (≈1 GW IT))
- Expected load by 2030
- 315 MW (index estimate)
- Annual energy at expected load
- about 2,070 GWh
- Power supply
- Grid (Duke Energy Indiana)
- Added gas burn, average day
- 24.6 MMcf/d (index estimate)
- Impact rating
- (2 of 4; scale)
- Confidence
- C (One secondary source)
- Last reviewed
- November 3, 2026
Sources
- Digital Realty picks Kokomo for 1 GW campus, its first in IndianaBaxtel · Oct 17, 2026
- Digital Realty eyes gigawatt-scale data center site outside Indianapolis, IndianaData Center Dynamics · 2026Not retrieved; confirmed via Baxtel
Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-085" in the subject.