Campus profile · DC-004

xAI Colossus 1 + 2

A hyperscale AI campus by xAI in Memphis / Southaven, TN, on the Southeast utilities grid. Status: operating, expanding.

Announced1,000 MWReported (unspecified)
Expected by 2030900 MWWeighted by build stage
Gas burn148.6 MMcf/dAverage day
Impact rating4 of 4Gas driven

Grid and gas impact

At full buildout this campus is announced at 1,000 MW. After phasing to 2030 and weighting by build stage, the index expects about 900 MW running by 2030.

At that level it would use about 5,913 GWh of electricity a year, roughly what 548,000 US homes use (EIA average of about 10,800 kWh per home), and add about 148.6 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by gas: most or all of its power comes from on-site or dedicated gas generation, so the strain falls on pipelines and local gas supply rather than the transmission grid. Rated 4 of 4 bolts. Solid bolts mean the campus is operating or under construction.

Research note. Cleanview: 1,498 MW of operating gas turbines across both sites (partly mobile). Operating IT load estimates span 250–750 MW. Electricchoice's separate 2 GW Southaven row treated as the same program.

Fact sheet

Index ID
DC-004
Campus
xAI Colossus 1 + 2
Developer / tenant
xAI
Segment
Hyperscale AI
Location
Memphis / Southaven, TN
State / province
Tennessee
Country
United States
Metro
Memphis
Grid region
Southeast utilities
Electric utility
TVA / MLGW + on-site gas
Status
Operating, expanding (counts 90% toward 2030)
Online / target
2024–
Announced capacity
1,000 MW (Reported (unspecified))
Expected load by 2030
900 MW (index estimate)
Annual energy at expected load
about 5,913 GWh
Power supply
Grid + on-site gas
Added gas burn, average day
148.6 MMcf/d (index estimate)
Impact rating
Gas (4 of 4; scale)
Confidence
B (Several consistent sources)
Last reviewed
November 3, 2026