Data centers in Tennessee

1 tracked campus of 100 MW or more in Tennessee, on the Southeast utilities grid. The largest expected load by 2030 is xAI Colossus 1 + 2.

Campuses1100 MW or more
Announced1,000 MWAt full buildout
Expected by 2030900 MWWeighted by build stage
Gas burn149 MMcf/dAverage day

Campuses in Tennessee

CampusLocationGrid regionStatusAnnounced MWExpected MW 2030Power supplyGas MMcf/dImpactConf.
xAI Colossus 1 + 2xAI · DC-004Memphis / Southaven, TNSoutheast utilitiesOperating, expanding1,000900Grid + on-site gas148.6GasB

Expected load and gas burn are index estimates. See the methodology and the source log.