Campus profile · DC-078

Nebius Independence

A hyperscale AI campus by Nebius in Independence, MO, on the SPP grid. Status: announced.

Announced1,200 MWCampus potential
Expected by 2030252 MWWeighted by build stage
Gas burn16.4 MMcf/dAverage day
Impact rating2 of 4Grid driven

Grid and gas impact

At full buildout this campus is announced at 1,200 MW. After phasing to 2030 and weighting by build stage, the index expects about 252 MW running by 2030. That is about 0.4% of the SPP 2025 peak (56,000 MW).

At that level it would use about 1,656 GWh of electricity a year, roughly what 153,000 US homes use (EIA average of about 10,800 kWh per home), and add about 16.4 MMcf/d of natural gas burn on an average day, counting both on-site generation and the region's gas-fired power plants.

Its rating is driven by grid load: power is expected to come mostly from the utility grid, so the effect shows up in transmission, capacity and generation needs, and in the gas burned by the region's power plants. Rated 2 of 4 bolts. Outlined bolts mean the campus is approved, announced or proposed and may not be built as planned.

Research note. Up to 1.2 GW on ~400 acres.

Fact sheet

Index ID
DC-078
Campus
Nebius Independence
Developer / tenant
Nebius
Segment
Hyperscale AI
Location
Independence, MO
State / province
Missouri
Country
United States
Metro
Kansas City
Grid region
SPP
Electric utility
TBD
Status
Announced (counts 35% toward 2030)
Online / target
Not disclosed
Announced capacity
1,200 MW (Campus potential)
Expected load by 2030
252 MW (index estimate)
Annual energy at expected load
about 1,656 GWh
Power supply
Not disclosed
Added gas burn, average day
16.4 MMcf/d (index estimate)
Impact rating
Grid (2 of 4; scale)
Confidence
C (One secondary source)
Last reviewed
November 3, 2026

Sources

Every source used across the index is listed in the source log. Spotted an error? Email [email protected] with "Correction: DC-078" in the subject.

How to cite

Data Center Index (datacenterindex.info), Discovery Energy. "Nebius Independence" (DC-078), https://datacenterindex.info/campuses/dc-078-nebius-independence/, updated November 3, 2026.