United States · state
Data centers in Arizona
2 tracked campuses of 100 MW or more in Arizona, on the West: Desert Southwest grid. The largest expected load by 2030 is Tract Buckeye Tech Corridor.
Campuses2100 MW or more
Announced3,300 MWAt full buildout
Expected by 2030513 MWWeighted by build stage
Gas burn40 MMcf/dAverage day
Campuses in Arizona
| Campus | Location | Grid region | Status | Announced MW | Expected MW 2030 | Power supply | Gas MMcf/d | Impact | Conf. |
|---|---|---|---|---|---|---|---|---|---|
| Tract Buckeye Tech CorridorTract · DC-053 | Buckeye, AZ | West: Desert Southwest | Announced | 1,800 | 378 | Not disclosed | 29.6 | C | |
| Hassayampa Ranch Data CenterArizona Land Consulting · DC-064 | Tonopah, AZ | West: Desert Southwest | Proposed | 1,500 | 135 | Not disclosed | 10.6 | D |
Expected load and gas burn are index estimates. See the methodology and the source log.